Plan Review Submittals

Fire Prevention Bureau

Plan review submittals

Before a fire protection system can be installed or modified within the Plainfield Fire Protection District, the design must be reviewed and approved by the Fire Prevention Bureau. This applies to new construction, tenant improvements, additions, and system retrofits.

Plan review ensures that proposed fire alarm, fire sprinkler, and suppression system designs comply with the adopted fire code, referenced NFPA standards, and District ordinances. Submittals that are incomplete or missing required documents will be returned, so please review the requirements below before uploading your plans.

Skip to submittal form ↓

The Process

How plan review works

1

Prepare

Assemble complete plans, calculations, and cut sheets per the requirements below.

2

Submit

Upload your documents using the form at the bottom of this page.

3

Review

A fire inspector reviews the submittal for code compliance. You'll be contacted if corrections are needed.

4

Approval

Once approved, a permit is issued and installation may proceed. Rough-in and final inspections follow.

What to Include

Submittal requirements by system type

Each system type has specific documentation requirements. Incomplete submittals will be returned for correction, which delays your project timeline.

Fire Alarm Systems

Required documents for new, modified, or expanded fire alarm system submittals:

  • Complete plan set showing device locations, wiring, and conduit routing
  • Fire Alarm Control Panel (FACP) location and annunciator placement
  • Notification Appliance Circuit (NAC) voltage drop calculations
  • Battery calculation worksheets
  • Equipment cut sheets / data sheets for all devices
  • Sequence of operations matrix
  • NICET certification of the system designer
NFPA 72

Fire Sprinkler Systems

Required documents for new, modified, or expanded automatic sprinkler system submittals:

  • Working plans showing pipe layout, head locations, and hanger details
  • Hydraulic calculations
  • Water supply data including a current flow test (within 12 months)
  • Equipment cut sheets for heads, valves, and components
  • Hanger and seismic bracing details (if applicable)
  • NICET certification of the system designer
NFPA 13 · NFPA 13R · NFPA 13D

Underground Fire Mains

Required documents for underground fire service piping, hydrants, and fire department connections:

  • Site plan showing pipe routing, depth, and material
  • Hydrant and FDC locations
  • Thrust block and restraint details
  • Material and fitting specifications
  • Backflow preventer details (if applicable)
NFPA 24

Special Suppression & Kitchen Hoods

Required documents for kitchen hood suppression, clean agent, dry chemical, or other special hazard systems:

  • System design plans and coverage diagrams
  • Equipment cut sheets and agent specifications
  • Manufacturer's design and installation manual reference
  • Exhaust and makeup air duct details (kitchen hoods)
  • UL 300 listing documentation (kitchen hoods)
NFPA 96 · NFPA 17A · NFPA 2001
Upload

Submit your plans

Before you upload

Use the form below to submit your plan review documents. Combine your plans, calculations, and cut sheets into as few files as possible — PDF format is preferred. Include your business name and a project description so the Bureau can route your submittal to the correct reviewer.

You will receive a confirmation once your submittal is received. If documents are missing or corrections are needed, the assigned inspector will contact you at the email address provided.

There was a problem saving your submission. Please try again later.
Please wait while your submission is being saved...
Thank you, your submission has been received.